Gas Pipeline Design


IMG_0372

Second biggest investment in the gas project in Macedonia was the preparation of the technical documentation for the 5 lots for major gas network. Chakar & Partners has complete technical documentation at the level of Main Design for the lot 5 from Skopje – Tetovo – Gostivar –  Kicevo L=110km.

 

A Main pipeline, as such, of great length, along its path crosses a growing number of natural and man-made obstacles as are roads, railways, underground and surface infrastructures, channels etc.

 

A part from the civil engineering parts with this project was prepared mechanical and electrical part. In addition was prepared Elaborate for expropriation, Study for environment protection, Project for organization etc.

 

The project has been successfully completed in the anticipated period.