Construction of the gas pipeline section Shtip – Negotino is the biggest investment in the gas sector in Macedonia and it is extension of the previous constructed section Klechovce – Shtip in length of 61 km. The total length of this section is 36 km. Chakar & Partners provided consulting services, making construction designs, as build designs, engineering and construction one section of the civil part in this project.
Technical characteristics of the gas pipeline section Shtip – Negotino:
- 500 of the main pipe
- VS – Valve Stations 4
- GMRS – General Measure Regulation Stations 2
- Cathode Stations 3
- Electrical connections 6
- Crossing under the roads and railways
- crossing under the bigger rivers
- crossing under the main oil pipeline