The construction of the gas pipeline section Klechovce – Shtip was the biggest investment in the gas sector in Macedonia in the last 20 years. The total length of this section is 61km. Chakar & Partners provided consulting services, making construction designs, as build designs, engineering and construction. A part from the civil part Company is directly responsible for the hydro testing, NDT and DT, crossings, cathode protection, electrical part, HDPE pipe installation and pipeline marking.
In addition company is responsible for the H&S on site for the all companies involved in this project.
Technical characteristics of the gas pipeline section Klechovce – Shtip:
- 500 of the main pipe
- VS – Valve Stations 7
- Pig Launcher Station 1
- Cathode Stations 3
- Electrical connections 3
- Crossing under the roads and railways
- crossing under the bigger rivers